Te Ara o Te Ata/Mt Messenger Bypass is a 6 km bypass road in North Taranaki that aims to replace the existing stretch of winding and often closed section of State Highway 3 connecting Taranaki to Waikato. The project involves extensive bat management, with radio-tracking to identify roost locations and ongoing vegetation removal for road alignment and works access.
Learn more here.
We provided specialist bat ecology oversight to support the discharge of consent conditions, delivering pre-felling and pre-de-risking bat surveys. This included the deployment and analysis of AR4 acoustic loggers, thermal and acoustic roost emergence and dawn watch surveys, arborist tree inspections, and felling oversight with post-felling checks throughout tree felling and de-risking operations. We reviewed the project Bat Management Plan and reported to council against consent requirements. Alongside this, we led community engagement — presenting bat information to local schoolchildren — and developed a new neoprene-flap, non-invasive de-risking method to replace expanding foam.
Contact us to discuss your unique requirements.